We’ve been doing some fencing recently as part of setting up new calf paddocks, and it has highlighted just how many opportunities there are to standardise even a relatively simple farm job.
Fencing hasn’t traditionally been an area we’ve focused heavily on in terms of documented standards. But as we worked through the job, one thing became very clear:
You can’t assume someone knows how to do a job correctly, accurately or to a high standard simply because they’ve done it before.
Our whole team has fenced many times. Yet we still ended up with inconsistent results.
That’s not necessarily a people problem. It’s often a standards problem.
Safety. Quality. Accuracy.
These are the three words I want our team thinking about when they complete any job.
Accuracy in particular is something I think farming can be a little too relaxed about.
How often do we hear:
“Roughly.”
“That’ll do.”
“Just step it out.”
Being an engineer, I like things measured properly. Stepping out the distance between fence posts is not accurate. Depending on who does the stepping, one fence might end up with 15 posts while another ends up with 10.
A tape measure removes the guesswork.
The same applies to post height, post spacing, insulator spacing, gate widths and wire placement.
One fencing job. At least 14 opportunities to standardise.
When we looked properly at the process, there were standards we could define for almost every step, including:
- setting out a straight fence line between strainer posts
- ensuring strainer posts and quarter rounds are installed at the correct height
- using a level when ramming posts
- reeling out wire without creating tangles
- measuring the correct spacing between insulators
- installing insulators straight, centred and at the correct height
- stapling wires neatly and consistently
- defining standard wire spacing for different fence types
- setting a standard distance between posts
- correctly spacing strainer posts when installing gates
- connecting electricity neatly across fence wires
- attaching wire correctly to strainer posts
- connecting the electric fence system correctly
- leaving the site clean, with offcuts and waste removed
That’s at least 14 opportunities for standardisation in one basic farm process.
And that’s before we start looking at other jobs across the farm.
A quality job doesn’t have to take longer
One of the most interesting lessons from this was that better quality did not mean more time.
Using a clear process, I installed insulators across 17 posts in around 45 minutes — and that was with a pretty average hammer.
A team member had previously spent more than two hours doing 14 posts, and the result still wasn’t correct.
The difference wasn’t speed or experience.
It was the process.
If you have a clear standard and repeatable way of doing the job, you can often achieve a better result in less time.
Experience doesn’t guarantee quality
This example also reinforced another important point.
Someone can have years of farming experience and still complete a job differently from how you want it done.
Equally, someone relatively new to the job can achieve an excellent result if they have a clear standard, the right tools and a simple process to follow.
That’s why Standard Work is such an important part of Lean.
The goal isn’t to remove people’s knowledge or judgement. It’s to define the best known way of doing a job so everyone has a clear starting point.
What we’re changing
We’re now working on documenting our fencing standards and making quality and accuracy a much more deliberate part of the conversation.
And yes, that also means a tape measure and level are going to become non-negotiable!
Because “good enough”, “roughly” and “that’ll do” don’t create consistent results.
Clear standards do.